#4 Briefs

House London #4 is on Saturday 16 January 2027 at Newspeak House (sign up on Luma). These are draft briefs, written from the gaps left after the first 50 projects across #0 to #3: questions nobody has answered yet, and datasets in the Data Asset Register nobody has opened. They'll be sharpened before the day.

Every brief points at the earlier projects it builds on. Start where they stopped, not from scratch.

Overview

The briefs

Brief 4A: Freestyle

Your call: no starter data required.

Pick any question about London housing, or any dataset in the Data Asset Register, and build a model, a map, a tool or a story with it. Several of House London's best projects started here.

Brief 4B: Why don't permissions become homes?

The big one. A credible partial answer counts as a win.

The question: permission is granted, and then often nothing happens. Can you split London's stalled pipeline into its causes, and say roughly how much each one accounts for?

What we already know: Stalled London found about 100,000 approved homes with no recorded start, and London Land Ledger found permitted land for about 171,800 homes (probably high). ARTMF found lapses nearly doubled (16% to 29%) and pointed at the cost of credit, but from a single rate cycle. Conditions Queue found 54% of condition sign-offs miss their deadline. Homes vs Hotels found stalls aren't where temporary-housing need is. Each project took one cause. Nobody has joined them up.

Candidate causes: viability (land bought too dear, build-cost inflation, Section 106 and affordable-housing obligations, renegotiation); pre-commencement conditions; building safety (Gateway 2 and the second-staircase rule); permissions held as assets rather than built; build-out pace on large phased sites; grid and water connections; who builds (housing associations' retreat); and data artefacts (superseded permissions, starts never recorded).

Starter data: Planning London Datahub guest API (start, completion and lapse dates per scheme); Foundations; brownfield land registers; HM Land Registry OCOD/CCOD for ownership; the London Development Database export (scheme-level history to 2020, unused so far); council Section 106 registers and Infrastructure Funding Statements; viability assessments in planning documents.

Possible directions: a scheme-level join of lifecycle dates, conditions, ownership and building-safety route; a "reasons for stalling" classifier over planning documents; a deep dive on one borough's stalled list, checked site by site.

Audience: GLA planning, borough housing-delivery teams, the London Plan examination.

Heads up: a permission lapses only if work hasn't lawfully begun within its time limit (usually three years), and a token start keeps it alive. Schemes approved from 2023 haven't reached their deadline yet, so they can't be counted as lapsed.

Brief 4C: Starts or completions?

Tightly scoped. Good for one or two people.

The question: where does London's pipeline leak most: between permission and start, or between start and completion? How long does each stage take, and does it vary by borough and scheme size?

What we already know: about 54% of permissions started within three years (ARTMF's companion analysis), and London's Housing Pipeline confirmed starts are genuinely falling. London approved 320,203 homes but completed 184,169 over the same period (Homes vs Hotels), a gap that mixes both stages with timing. Nobody has measured start to completion directly.

Starter data: Planning London Datahub guest API; EPCs for new dwellings (a completion proxy MHCLG itself recommends, unused so far); MHCLG building-control "indicators of new supply" (unused); the Housing Delivery Test (unused).

Possible directions: a funnel chart, permission to start to completion, by borough; survival curves for each stage; cross-checking Datahub completions against new-dwelling EPCs.

Heads up: lifecycle dates are self-reported and sparse before about 2015, and recent years are incomplete because records arrive late. Treat the latest year as a lower bound.

Brief 4D: Who holds the stalled permissions?

Handle with care.

The question: are London's unbuilt permissions held by housebuilders, land promoters, investors, housing associations or councils? Do some kinds of holder build out far less than others?

Why it matters: "land banking" is usually asserted, not measured. Ownership data can test it.

Starter data: HM Land Registry UK and overseas company ownership (OCOD/CCOD, used once so far, by PropertyGo); the Price Paid to UPRN lookup; Companies House; stalled sites from Stalled London or the Datahub.

Possible directions: match stalled sites to corporate owners and classify them; compare start rates by holder type; flag permissions bought and sold without a start.

Heads up: OCOD/CCOD covers corporate owners only, not private individuals. Name a company, not a person, and be careful with claims about intent.

Brief 4E: Settle The Spike

One analysis could cement a finding.

The question: The Spike found councils make about ten times more decisions on the last legal day, and those decisions approve less often (about 72% vs 81%, re-run on Foundations). QA-Agent's review asked the question that matters: is that the deadline rush cutting corners, or are the hardest applications simply the ones still waiting at the deadline?

Ways to settle it: appeals (if deadline-day refusals are overturned at appeal more often than other refusals, that points to corner-cutting); composition (compare the mix of applications decided on the day with the rest, or reuse The Spike's own text model to compare predicted approval); and the official P152/P154 timeliness figures councils report, from MHCLG's planning application live tables (unused so far).

Starter data: Foundations; the first data release (The Spike's 343k applications, which include appeal fields); Planning Inspectorate appeal decisions; MHCLG planning application live tables.

Heads up: London Planning Atlas found decisions cluster on the deadline but timing doesn't change the outcome, for full applications only. Reconciling that with The Spike is part of the job. Only some refused applicants appeal, so the appeals test isn't perfectly clean.

Brief 4F: Are the growth areas growing?

Map-friendly.

The question: the London Plan designates around 40 Opportunity Areas for most of its new homes and jobs. Are permissions, starts and completions actually landing there?

Starter data: London Plan Opportunity Areas (unused so far); Foundations; the Planning London Datahub; brownfield land registers; TfL PTAL; GLA Local Plan data.

Possible directions: a scorecard per Opportunity Area (permitted, started and completed homes against its indicative capacity); which ones are moving and which are stuck.

Heads up: an Opportunity Area boundary is a policy designation, not a permission or a promise.

Brief 4G: Migration as its own lens

Handle with care.

The question: how much of London's housing pressure comes from population change (international, domestic and student migration), and where does it land?

What we already know: Ctrl + Alt + Rent and Build in London looked at migration alongside foreign investment; Move the Room looked at international students. None made migration the headline.

Starter data: Census 2021; Department for Business and Trade inward investment results; HESA student counts; ONS population and migration estimates (not yet in the register).

Heads up: this is a contested topic. Stick to what the data shows, state its limits, and avoid treating people as a problem to be solved.

Brief 4H: Re-run a finding

Verification track. Moves a finding up the ladder.

The question: most House London findings are still team-reported: one team, one day. Pick one and independently reproduce it, with fresh code, newer data or a different method. Does it hold?

Good candidates: PropertyGo's 70% land share (against MHCLG's land value estimates); Agent Check's persistent planning-agent effect; The Boundary Line's small-sites counterfactual; SMK's 33 of 75 seats.

Output: a short replication note, published next to the original finding, whatever the result. "It doesn't hold" is as useful as "it does".

Brief 4I: Answer a government question

Policy track. No data skills required.

The question: government departments publish the research questions they want answered, their Areas of Research Interest, catalogued at ari.org.uk. Pick a housing one and answer it with London evidence, from House London's projects or your own analysis.

For example: MHCLG asks "What are the best examples of how to incentivise local residents to support new housing and infrastructure in their local areas?" (Areas of Research Interest, March 2025). SMK's work on market and voter demand speaks straight to it.

Output: a two-page evidence note aimed at the department that asked.

Brief 4J: Clarify or sharpen an existing analysis

Good for a team that wants a head start.

The question: many earlier projects found something promising in a single day but left it rough: a method nobody documented, a caveat flagged but not fixed, a chart that doesn't quite say what the analysis found. Pick one and make it clearer, tighter or more useful.

Good candidates: London Land Ledger (its follow-up suggests the 171,800 figure is high: find out by how much); Not a Growth Problem (its result hangs on one assumed parameter: estimate it); PacLondon (its empty homes are placed by simulation: place them from real counts); Y THO and Sitting on Land (good questions, methods not written up); Planoscope (separate the borough effect from who decides).

How this differs from 4H: re-running checks whether a finding holds. Sharpening improves the analysis itself, its method, its uncertainty or how it's explained, so the next person can build on it.

Output: an improved version, published alongside the original, crediting the team that started it.

Data nobody has used yet

Of the 53 datasets in the House London Data Asset Register, 44 have been used by at least one team, but about 20 of those by only one. These have never been opened:

  • Housing Delivery Test (MHCLG): each borough's delivery against its requirement. Briefs 4B and 4C.
  • Building-control indicators of new supply (MHCLG): an independent cross-check on completions. Brief 4C.
  • EPCs for new dwellings: a reliable new-build completion proxy. Brief 4C.
  • London Development Database export (GLA, 2020): scheme-level history. Brief 4B.
  • Planning application live tables (MHCLG): the official P152/P154 timeliness figures. Brief 4E.
  • London Plan Opportunity Areas (GLA). Brief 4F.
  • Digital Planning Register and the Digital Planning Data Schemas (Open Digital Planning).

And used only once, so far from exhausted: HM Land Registry company ownership (OCOD/CCOD), MHCLG land value estimates, the Price Paid to UPRN lookup, council temporary-accommodation spend (RO4), social lettings and waiting lists, construction output prices, and the GLA building stock model.

These briefs are drafts. If you have a question you'd like House London to take on, or data that could answer one of these, get in touch.